The ever efficient Fairfax Co. zoning folks determined that the DUMC and 1018 sheds were too close to the property line and had to be moved, so we gathered together to move the sheds to an acceptable location, about 40 feet away from their original spot. On Sat, 7 Aug we built a pad to put them on and on the 14th we did the actual move. Thanks to all those that helped out!
Building a frame for the pad
Moving the curbs The gravel arrives
Spreading out the gravel
The pad is almost complete.
Finishing the pad and smoothing out the gravel
The shed has been cleared out . . . and this is where all the stuff ended up
Happy workers A little side project for the church
The big fork lift arrives Mr. Luehrs attaches the straps
And the little shed is on the move
Same procedure for the troop shed
Move is complete; time to reload
Hauling the gear back to the shed Done!
The final product!